Find index numbers by fixed base and chain base method from the following data about the prices.
Year $2011$ $2012$ $2013$ $2014$ $2015$ $2016$
Price $40$ $45$ $48$ $60$ $75$ $90$

Answer

Fixed base index numbers $=100,112.5,120,150,187.5,225$
Chain base index numbers $=100,112.5,106.67,125,125,120$

Need a full question paper?

Generate a complete, print-ready paper with questions like this in minutes — across 16+ boards, with answer keys.

Start Generating Free

Similar questions

State properties of binomial distribution (Any Six points)
$\lim _{x \rightarrow 4} \frac{\sqrt{x+5}-3}{4-\sqrt{x+12}}$
For two events $A$ and $B$ of the sample space of a random experiment, $2 P(A)=3 P(B)=4 P(A \cap B)=0.6$. Obtain the probabilities for the following events.
$(1)\ \left(A^{\prime} \cap B^{\prime}\right)$
$(2)\ (A-B)$
$(3)\ \left(A^{\prime} \cap B\right)$
The probability that a bomb dropped from a plane over a bridge will hit the bridge is $\frac{1}{5}$. Two bombs are enough to destroy the bridge. If $6$ bombs are dropped on the bridge, find the probability that the bridge will be destroyed.
A person has kept 4 cars to run on rent. The probability that any car is rented during the day is $\frac{3}{5}$. Find the probability that more than one but less than 4 cars are rented during a day.
State the limitations of cost of living index number.
Find the values of the following: $\lim _{x \rightarrow 2}\left[\frac{2}{x-2}-\frac{4}{x^{2}-2 x}\right]$
The mean of a normal distribution is $55$ and its $S.d.$ is $15 .$ If $(1)\ P\left[50 \leq X \leq k_{1}\right]=$
For a normal distribution $\mu=50$ and $\sigma=15$. If $ (1)\ P\left[X \leq k_{1}\right]=0.9332$ and $(2)\ P\left[X \geq k_{2}\right]=0.6915$, find the values of $k_{1}$ and $k_{2} .$
A factory has received an order to prepare $50,000$ units of an item in a certain time period. The probability of completing this work in the given time is $0.75$ and the probability that the workers will not declare strike during that time period is $0.8.$ The probability that this work will be completed during the given period and the workers will not declare strike is $0.7.$ Find the probability that
$(1)$ The work will be completed as per schedule under the condition that the workers have not declared strike.
$(2)$ Find the probability that the workers do not declare strike in the given period knowing that the work is completed as per schedule.