Question
Using ruler and a pair compass only, construct a triangle XYZ given YZ = 7 cm, ∠XYZ = 60° and ∠XZY = 45°. Draw the bisectors of angles X and Y.

Answer

Steps of Construction:
(1) Draw a line YZ = 7 cm.

(2) Y as a centre draw an ∠XYZ = 60°.
(3) Z as a centre draw an ∠XZY = 45°.
(4) From X and Y as centre draw bisector of ∠X and ∠Y, which meet at point O.

Need a full question paper?

Generate a complete, print-ready paper with questions like this in minutes — across 16+ boards, with answer keys.

Start Generating Free

Similar questions

Arrange the given fractions in descending order of magnitude:
$\frac{5}{16}, \frac{13}{24}, \frac{7}{8}$
Construct a triangle ABC given AB = 6 cm, BC = 5 cm and CA = 5.6 cm. From vertex A draw a perpendicular on to side BC. Measure the length of this perpendicular.
Find the $L.C.M$. of the following group of numbers, using
  1. the prime factor method and
  2. the common division method
$22, 121$ and $33$
Find the L.C.M. of the following group of numbers, using
  1. the prime factor method and
  2. the common division method
18, 24 and 96
From the following figure find ;
(i) x
(ii) ∠ABC
(iii) ∠ACD
The length of two ropes are in the ratio 7 : 5. Find the length of:
(i) shorter rope, if the longer one is 22.5 m
(ii) longer rope, if the shorter is 9.8 m.
Construct traingle ABC, when : AC = 4.5 cm, BC = 6 cm and ∠C = 60°.
Jagan went to another town such that he covered 240 km by a car going at $60 kmh ^{-1}$. Then he covered $80 \ km$ by a train, going at $100 kmh ^{-1}$ and the rest 200 km , he covered by a bus, going at $50 kmh ^{-1}$. What was his average speed during the whole journey?
Rohit goes $350$ km in $5$ hours. Find:
(i) his speed
(ii) the distance covered by Rohit in $6.2$ hours
(iii) the time taken by him to cover $210$ km.
The following data represents the weekly wages (in ₹) of 15 workers in a factory:
900, 850, 800, 850, 800, 750, 950, 900, 950, 800, 750, 900, 750, 800 and 850.
Prepare a frequency distribution table. Now find,
(i) how many workers are getting less than ₹850 per week?
(ii) how many workers are getting more than ₹800 per week?